Stainless steel walking gantry crane is a kind of lifting equipment made of stainless steel as the main material. It consists of a mast, electric hoist, traveling device and other parts. The door frame is made of stainless steel, which has the advantages of high strength and corrosion resistance, and can meet the needs of various occasions. The electric hoist is an important component used to lift and move items. It is also made of stainless steel and can effectively prevent rust and corrosion. The traveling device allows the gantry crane to move between different positions for ease of use.
Features:
● Made of stainless steel, it has the advantages of high strength and corrosion resistance, and can meet the needs of various occasions.
● With multiple functions, it can lift and carry items of various shapes and weights, and can be fine-tuned vertically and horizontally to make the positioning of items more accurate.
● With remote control function, the operation of the equipment can be controlled from a long distance, which improves the safety and convenience of operation.
● The use of advanced traveling devices allows the gantry crane to move between different positions for ease of use.
● The appearance is beautiful and elegant, and meets the requirements of modern industrial production.
How to operate:
● Check the equipment: Before operation, the operator should carefully check the various equipment and components of the gantry crane to ensure that the equipment is in good working condition and is not damaged or faulty.
● Start the equipment: Follow the instructions in the equipment operation manual to start the main control system of the gantry crane to ensure that the equipment can operate normally.
● Control walking: Use the control panel or remote control to control the walking of the gantry crane to move it to the required position. Operators should drive carefully to avoid hitting or crushing other equipment or objects.
● Lifting items: Use the winch mechanism of the gantry crane to lift items that need to be moved or transported. During the hoisting process, operators should operate carefully to ensure that the hoisting process is safe and smooth.
● Moving items: Move the hoisted items to the target location, then carefully lower the items to ensure safe placement.
● Shut down the equipment: After completing the operation, shut down the main control system of the gantry crane and ensure that the equipment is in a stopped state.